Código de valores: China Aluminum International Engineering Corporation Limited(601068) abreviatura de valores: China Aluminum International Engineering Corporation Limited(601068) número de anuncio: p 2022 – 015 China Aluminum International Engineering Corporation Limited(601068)
Anuncio relativo a los litigios relativos a las filiales de propiedad total
El Consejo de Administración y todos los directores de la empresa se asegurarán de que el contenido del presente anuncio no contenga registros falsos, declaraciones engañosas u omisiones importantes, y asumirán la responsabilidad individual y solidaria de la autenticidad, exactitud e integridad de su contenido.
Consejos importantes:
The Litigation stage of the case: Tianjin Binhai New Area People ‘s Court has Mediated;
The Party Status of Listed Companies: The demandante China Aluminum International Engineering Corporation Limited(601068) (tianjin) Construction Co., Ltd. (hereinafter referred to as Tianjin Construction) is a full – owned subsidiary of China Aluminum International Engineering Corporation Limited(601068) (hereinafter referred to as the company);
The amount involved in the case: the amount involved in the Lawsuit of Tianjin Construction includes requesting the defendant to repay the principal amount of RMB 6364311479 Yuan, Interest provisionally Calculated RMB 728360105 Yuan, Case Litigation fees, Preservation fees;
Si tendrá un impacto negativo en las ganancias y pérdidas de las empresas que cotizan en bolsa: Dado que el Acuerdo de mediación alcanzado en este caso no se ha cumplido, no se puede juzgar el impacto de este litigio en los beneficios de la empresa en el período en curso o en los beneficios posteriores al período.
Las Partes en este caso
Demandante: Tianjin Construction
Lugar de residencia: w24, zona comercial oeste, zona piloto de libre comercio de Tianjin (zona económica aeroportuaria)
Representante legal: Li Huaguo
Demandada: Tianjin Jizhou Xincheng Construction Investment Co., Ltd. (en lo sucesivo denominada Xincheng Construction)
Dirección: No. 1 – 20, xianglin Road, zhouhewan Town, Jizhou District, Tianjin
Representante legal: Gao jianguang
Fondo básico de la causa
El 10 de diciembre de 2020, la construcción de Tianjin y la construcción de la nueva ciudad firmaron el contrato pertinente, con el fin de no influir en el progreso de la construcción del proyecto de ambas partes, se acordó que la construcción de Tianjin invertiría 6364311479 yuan en la construcción del proyecto, el plazo del 10 de diciembre de 2020 al 30 de septiembre de 2021, la construcción de la nueva ciudad devolverá el principal y los intereses a tiempo. New Town construction as of Tianjin Construction Prosecution date, failed to pay the principal and interest in accordance with the Agreement. De acuerdo con el Acuerdo de ambas partes, si el pago atrasado de la construcción de la nueva ciudad, el pago de intereses se calculará sobre la base del tipo de interés anualizado del 10%, la construcción de la nueva ciudad pagará el principal adeudado a la construcción de Tianjin y pagará intereses sobre la base del tipo de interés anualizado del 10%.
Debido a que la construcción de la nueva ciudad no reembolsa el principal y los intereses de acuerdo con el acuerdo, la construcción de Tianjin presentó recientemente una demanda al Tribunal Popular de la nueva zona costera de Tianjin, que se encuentra en Tianjin, y el Tribunal Popular de la nueva zona costera de Tianjin emitió la “notificación de aceptación de casos” (2022) No. 2322, Jin 0116, República de China), que aceptó la demanda de la construcción de Tianjin. El contenido específico de la demanda es el siguiente:
Solicitar el reembolso de 6.364314,79 yuan por la construcción de la nueva ciudad y el pago de intereses a partir del 10 de diciembre de 2020 hasta la fecha de pago efectivo, sobre la base de 6.364314,79 Yuan, por un total provisional de 7.283601,05 Yuan (7.092671584 Yuan);
Ii) Ordenar que los gastos de litigio y los gastos de conservación en este caso sean sufragados por la construcción de la nueva ciudad.
Tianjin Construction presentó una solicitud de preservación de la propiedad litigiosa al Tribunal Popular de la nueva zona costera de Tianjin para que adoptara medidas de conservación de la propiedad de la construcción de la nueva ciudad. El objeto de la preservación es el depósito bancario de 709267.715,84 Yuan o la propiedad equivalente, que incluye, entre otras cosas, la incautación, incautación y congelación de la nueva ciudad de conformidad con la ley. Tianjin Binhai New District People ‘s Court issued a civil decision (2022) Jin 0116 No. 2322 of the Early Republic of China), which decided to freeze the Bank Deposit of New City Construction RMB 7092671584 or to seize and seize other equivalent property.
Durante el juicio del caso, se llegó a un acuerdo sobre la construcción de Tianjin y la construcción de nuevas ciudades, y el Tribunal Popular de Tianjin Binhai New Area publicó recientemente la “Declaración de mediación civil” (2022) No. 2322, Jin 0116, República de China), cuyo contenido principal es el siguiente:
Tianjin Construction and New City Construction confirmed that, as of 28 February 2022, The New City Construction should pay the principal of Tianjin Construction RMB 6364311479 Yuan and the corresponding interest RMB 620154151 Yuan (from December 10, 2020 to September 30, 2021 by Annual Interest Rate of 6.5 per cent, from October 1, 2021 to February 28, 2022 by Annual Interest Rate of 10 per cent), El total es de 6.984656,30 yuan;
The New Town Construction agreed that the recorded amount of 15730000 Yuan, which has been Sealed by the Tianjin Binhai New District People ‘s Court, is used to pay the amount adeudated to Tianjin Construction, including the principal amount of RMB 927559279 Yuan, interest of RMB 620154151 Yuan as of February 28, 2022, and Litigation fees of RMB 19821700 Yuan, Preservation fees of RMB 500000 Yuan, El costo del seguro de responsabilidad civil es de 49.648,70 Yuan. Tras el pago de los pagos mencionados, se han pagado intereses al 28 de febrero de 2022 y el principal pendiente es de 5.436522,00 Yuan. El tiempo real de pago es el día de la apertura del Tribunal, desde el 1 de marzo de 2022 hasta la fecha efectiva de pago de los intereses, tomando como base 15.730000 Yuan, a un tipo de interés anual del 6,5%;
A partir del 1 de marzo de 2022, la construcción de Tianjin y la construcción de la nueva ciudad acordaron que los intereses adeudados se calcularían sobre la base del tipo de interés anualizado del 6,5%, y la construcción de la nueva ciudad pagaría íntegramente el principal y los intereses adeudados antes del 31 de agosto de 2023. Los detalles son los siguientes: 1. La construcción de la nueva ciudad reembolsará el principal y los intereses antes del 31 de marzo de 2022 por un total de 639000 Yuan, incluidos 304307,10 yuan y 608569290 Yuan. 2. La construcción de la nueva ciudad reembolsará 10 millones de yuan antes del 30 de noviembre de 2022, incluidos 2.127082,80 yuan en intereses y 7.872917,20 yuan en capital; 3. La construcción de la nueva ciudad reembolsará 10 millones de yuan antes del 28 de febrero de 2023, incluidos 656644,82 yuan en intereses y 934335,18 yuan en capital; 4. La construcción de la nueva ciudad reembolsará 10 millones de yuan antes del 31 de mayo de 2023, incluidos 516033,41 yuan en intereses y 948396,59 yuan en capital; 5. La construcción de la nueva ciudad reembolsará el principal restante y los intereses por valor de 219400.084,32 Yuan antes del 31 de agosto de 2023, incluidos 358494,19 yuan en intereses y 2.581590,13 yuan en capital.
Si el tiempo de pago efectivo del demandado es anterior a la última hora acordada, los intereses se calcularán sobre la base del tiempo de pago efectivo;
En caso de que la construcción de la nueva ciudad no pague a tiempo y en su totalidad una cantidad determinada de conformidad con las disposiciones anteriores, la construcción de Tianjin tiene derecho a solicitar al Tribunal Popular la ejecución obligatoria del principal y los intereses de los atrasos restantes, las costas judiciales, los gastos de conservación y los intereses de Las deudas duplicadas durante el período de demora en el cumplimiento, y a exigir que la construcción de la nueva ciudad pague la totalidad de la suma a tanto alzado;
Xincheng Construction will bear the case acceptance FEE, Preservation FEE and the Liability Insurance cost of Litigation Preservation paid by Tianjin Construction totally RMB 25286570.
Influencia de la demanda en el beneficio actual o posterior al período de la empresa
Dado que el Acuerdo de mediación alcanzado en este caso aún no se ha cumplido, no se puede juzgar el impacto en los beneficios de la empresa en este período o en los beneficios posteriores al período. La empresa cumplirá oportunamente la obligación de divulgación de información de acuerdo con el progreso de la demanda, y los inversores deben prestar atención al riesgo de inversión.
Se anuncia por la presente.
Consejo de administración 15 de marzo de 2022
Presentación de documentos
Acusación civil
Ii) Solicitud de conservación de bienes litigiosos
Notificación de aceptación de casos (2022) No. 2322, JN 0116)
Iv) orden civil (2022) Jin 0116, República de China no. 2322)
V) Declaración de conciliación civil (2022) Jin 0116, República de China no. 2322)